|
|
 |
 |
 |
 |
 |
| 4 of 5 |
 |
Laying the Pavers |
Setting out - The best way to ensure your paving pattern stays in line is to use
set out lines (a grid of string lines spaced at exact intervals around the perimeter
of the job). When setting up your grid remember to add 1/8" to each
paver width to allow for the gap between each unit.
Edge restraints prevent the pavers from moving horizontally
and also restrain the sand and road base. Place the pavers
gently on the sand bed leaving a gap of 1/8" between each
unit (this prevents chipping). Ensure pavers are selected
down the side of the pallets and randomly from different
pallets to ensure an all over blend.
|
 |
|
 |
|
|
|
 |
|